Skip to content Skip to footer

OPERATIONAL MANAGEMENT

Amida4 offers the operational management system, a data management system for production processes that will allow you, through a record of parameters and data specific to each production environment, to solve traceability requirements, production queues, batch management, generation of reports, etc.

The service is aimed at companies with low-voltage equipment and/or installations, which already have up-to-date documentation (electrical diagrams and lists of electrical equipment) and with up-to-date and consultable software (depending on the installation).

Play Video

01

WHY DO YOU NEED THE OPERATIONAL MANAGEMENT SYSTEM?

  • Because it is necessary to record and identify steps, processes, data and parameters specific to a team and/or production process
  • Because it is necessary to trace the final product with respect to the raw materials used or specific parameters of the process
  • Because you need real data from the production process in order to generate reports and/or operational dashboards of production, sequences, physical positions, quality and statistics
  • Because you need to know in real time how part or all of your production process behaves

Advantages

Current installation +
operational management
system. This system of measurement is based on
field data (already existing
or of new implementation)
plus a SCADA data acquisition system

The final product can be traced
with any defined parameter (raw materials, production parameters, data registered in place)
The generation of reports can
be managed with the SCADA in
a structured way and with
control of session and user
Generation of based reports
in real data. Obtaining of
Electronic Batch Reports (EBR) following the GMP postulates
and Master Batch Report (MBR) guidelines corresponding if applicable
Data can be registered manually,
via operator in the field, forms
with real data (process known
as “paper on glass")
Improvement of breakdown management and maintenance
Generation of dashboards
where you can link as many parameters as you require
Production process can be
viewed in real time and
evaluated by the selected parameters

Current installation + operational management
system. This system of measurement is based
on field data (already existing or of new
implementation) plus a SCADA data acquisition
system

The final product can be traced with any defined parameter (raw materials, production parameters,
data registered in place)
The generation of reports can be managed with
the SCADA in a structured way and with control of session and user
Generation of dashboards where you can link
as many parameters as you require
Generation of based reports in real data.
Obtaining of Electronic Batch Reports (EBR)
following the GMP postulates and Master Batch
Report (MBR) guidelines corresponding if
applicable
Data can be registered manually, via operator
in the field, forms with real data (process known
as “paper on glass")
Improvement of breakdown management and maintenance
Production process can be viewed in real time
and evaluated by the selected parameters

Current installation + operational management system. This system of measurement is based on field data (already existing or of new implementation) plus a SCADA data acquisition system

The final product can be traced with any defined parameter (raw materials, production parameters, data registered in place)
The generation of reports can be managed with the SCADA in a structured way and with control of session and user
Generation of based reports in real data. Obtaining of Electronic Batch Reports (EBR) following the GMP postulates and Master Batch Report (MBR) guidelines corresponding if applicable
Data can be registered manually, via operator in the field, forms with real data (process known as “paper on glass")
Improvement of breakdown management and maintenance
Generation of dashboards where you can link as many parameters as you require
Production process can be viewed in real time and evaluated by the selected parameters

02

PHASES OF THE SERVICE

  • 1st cost free visit
  • Non-binding guidance on the total price. Definition of the general concept
    – Joint validation meeting
  • Detailed budget based on the main agreed milestones plus an approximate list of the main materials to be installed. This budget, with reference to labor, can be presented in different formats:
    – hour pockets that can be reviewed weekly (if no other time pattern is agreed)
    – closed price based on closed list of milestones (billing by milestones)
  • First steps: Data collection > Definition and detailed description of objectives > Review and joint validation Client – Amida4
  • Definition of time milestones
  • Follow-up and weekly review (if no other time pattern is agreed) on the progress and achievement of the agreed objectives
  • Installation and commissioning
  • Delivery and training on deliverables

03

Deliverables

  • Schematics and electrical material lists of the new installation materials identified in the list of objectives
  • Files in EPLAN and PDF format
  • Wiring list of new installation materials
  • Physical identification on the ground [point – cupboard] and labeling of the new installation materials
  • Possibility of periodic monitoring billable per visit
  • Advice and subsequent consultancy
  • Rental of SCADA data acquisition equipment is offered

04

WHAT RESOURCES DOES AMIDA4 PROVIDE?

  • Expert staff in multidisciplinary Engineering and management of complex development and research projects

– Management of data collection and definition of the tasks to be performed – The ENGCONS tariff price will apply

  • Expert staff in Control Engineering and commissioning of machinery and complex installations

– Data collection and monitoring of the project – Proven experience in PLC languages, among others, Siemens, Schneider, Beckoff and Rockwell

  • Expert staff in Electrical Engineering, in the generation of diagrams and lists of electrical equipment in EPLAN software and in SCADA data acquisition systems

– Management of internal document and software generation tasks – The ENGELEC tariff price will apply

Need more information?